INSURANCE-PREFERRED CONTRACTOR

Apartment & Multifamily Building

Reconstruction

A fire, flood, or storm event in a multifamily property leaves a narrower margin for error than a single-family loss. Multiple units are affected, and tenants are displaced. The insurance file has to hold up to commercial adjuster scrutiny. Reconstruction has to be sequenced around partial occupancy, communicated clearly to residents, and documented in a way that satisfies a commercial insurance file.

CALL OUR TEAMGET AN ESTIMATE

REACH OUR COMMERCIAL TEAM

Large-Loss Inquiries & Commercial Projects

Ask specifically for a commercial project manager when you call.

☏916-481-3297

REQUEST COMMERCIAL ESTIMATE

Available 24/7 for emergency response in the Sacramento area only.

50+
In-House Tradespeople
300+
Projects Completed Annually
30+
Years of Reconstruction Experience
Major
Preferred Carrier Status

Multifamily Building RECONSTRUCTION

A Reconstruction Contractor Specializing In Multifamily Units

Most residential contractors aren’t built for multifamily work at scale. Here’s what DH Construction brings specifically:

  • Dedicated commercial project manager: one point of contact who owns the timeline, tenant communication, and adjuster relationship from start to finish
  • 50+ in-house tradespeople: carpenters, electricians, plumbers, and finishers on staff, not subcontracted. Faster mobilization, single accountability, better schedule control.
  • Preferred carrier status: contracted with multiple major insurance carriers, so your adjuster already knows our documentation standards and scope format
  • Xactimate-based master scopes: unit-by-unit documentation organized the way commercial adjusters expect, with loss-of-rents timeline support built in
  • Occupied-building experience: established protocols for working in partially occupied properties without compromising resident safety or habitability
  • 300+ projects completed annually: the volume that keeps crews experienced and carrier relationships current
Newly remodeled home living area reconstructed by DH Construction

Full Documentation Throughout The Reconstruction Process

Multifamily insurance claims are documentation-intensive, and the gaps that cause delays are almost always in the scope, not the policy. An adjuster who receives a disorganized estimate for a 12-unit fire loss will slow down. One who receives a clean, unit-by-unit Xactimate scope with photo documentation and a reconstruction schedule tied to loss-of-rents will move.

As a preferred and contracted vendor for multiple major commercial carriers, DH Construction’s documentation is already in the format your adjuster works with. Supplements for hidden damage, code upgrades, or scope expansions are handled by our team, not handed back to you to negotiate.

REQUEST An ESTIMATE

Insurance: What Property Owners And Managers Need To Know

Multifamily insurance claims are among the most documentation-intensive in the property reconstruction industry. A well-managed claim requires a master scope that clearly delineates unit-by-unit damage, documentation of common area and shared-system losses, and loss-of-rents support documentation tied to the reconstruction schedule.

As an industry leader in reconstruction and damage restoration, DH Construction’s documentation is already formatted to meet the standards your adjuster is working with. When supplements are needed for hidden damage revealed during demolition, code-required upgrades, or scope expansions from adjacent unit damage, our project managers handle the carrier communication.

What Sets DH Construction Apart for Reconstruction

The differentiators that matter to property managers, risk managers, and commercial adjusters.

CALL OUR TEAMGET AN ESTIMATE

Newly remodeled family room of a large house reconstructed by DH Construction

50+ In-House Tradespeople

Carpenters, electricians, plumbers, and finishers on staff, not subcontracted. Faster mobilization, better quality control, single accountability.

300+ Projects Completed Annually

Active project volume means experienced crews and established carrier relationships across all major commercial markets. For office, retail, industrial, and institutional buildings, see our commercial restoration services.

Large-Loss Specialization

Dedicated project management protocols for high-dollar, multi-system, or multi-tenant events.

Xactimate Proficiency

Estimates prepared in the format carriers require, with proper commercial pricing and code upgrade documentation.

HOW WE WORK

Our Reconstruction Process

A structured, transparent process designed for commercial property managers and their insurance carriers.

1

Emergency Response And Stabilization

Board-up, tarping, site security, and utility isolation to stop additional damage and secure the property immediately after the event.

2

Full Building Assessment

Unit-by-unit inspection to establish the full damage envelope, including adjacent units affected by smoke, water migration, or structural impact.

3

Master Scope And Adjuster Coordination

Xactimate estimate organized by unit and common area, formatted for commercial adjuster review and structured to support the loss-of-rents documentation. On-site walkthrough with the carrier’s adjuster to resolve scope questions before demolition begins.

4

Written Project Schedule

Unit-by-unit timeline provided to property management for tenant communications and loss-of-rents documentation.

5

Phased Reconstruction

Units sequenced for reconstruction based on damage severity, tenant displacement status, and access logistics.

6

Permits, Inspections, And Close

All permits pulled and passed. Units returned to tenants with occupancy confirmed.

Frequently Asked Questions: Multifamily Properties

How do you manage a loss that displaces multiple tenants at once?

You get a dedicated project manager as your single point of contact. We provide a written unit-by-unit reconstruction schedule so you can give tenants accurate return dates and manage the displacement period. Our documentation also supports the loss-of-rents portion of your claim, so the file your adjuster receives connects the reconstruction timeline to your income loss.

Can you work in a partially occupied building?

Yes, tenant-occupied reconstruction is standard for our commercial project teams. We isolate active work areas from occupied units, manage access and noise per occupied-building protocols, and sequence work to minimize disruption to residents who haven’t been displaced. This requires tighter coordination than a vacant building, and our in-house crew model makes it practical.

How do you handle the insurance documentation for a multi-unit loss?

We prepare a master Xactimate scope, organized unit by unit and by common area. Each affected space is documented separately so the insurance file is clean and auditable. When supplements are needed (for concealed damage, code upgrades, or scope expansions due to adjacent-unit damage), we handle the carrier communication. We’re a preferred and contracted vendor for major carriers, which means your adjuster already knows our documentation standards.

What if the building owner’s insurance and a tenant’s renter’s insurance are both involved?

Typically, the building owner’s policy covers the structure and building systems; the tenant’s renter’s insurance covers their personal property and sometimes additional living expenses. DH Construction’s reconstruction scope covers the structural and building-system side. We document the structural damage separately from any contents loss, which keeps the files clean for both carriers.

WHERE WE SERVE

Service Areas for Multifamily Unit Reconstruction

Call us to reach our team from any service area. For large-loss inquiries, ask specifically for a commercial project manager.

TALK TO A SPECIALIST

Reach A Project Manager

For large-loss inquiries, business interruption events, or multi-tenant losses, ask specifically for a commercial project manager when you call.

☏916-481-3297

GET AN ESTIMATE

CALIFORNIA

Sacramento

Sacramento County and the greater Capital Region, including Elk Grove, Roseville, Folsom, and West Sacramento.

CALIFORNIA

Chico

Butte County commercial reconstruction, including retail, multi-family, and institutional properties.

NEVADA

Sparks / Reno

Washoe County commercial reconstruction, including the Reno-Sparks metro commercial corridor.

Multi-Unit Building Reconstruction

Multifamily Property Loss?

Call DH Construction, your dedicated project management, 50+ in-house tradespeople, and insurance-preferred status across Sacramento, Chico, and Sparks/Reno.